Ref No Project Plant Date Estimate Awarded Awarded Bidder Items File Actions
CET-17(4)/4852/2023-295 Replacement of 6.6 kv switch boards of CPP-1, RSP ROURKELA STEEL PLANT 20 Feb 2026 19.0700 21.9400 EASTERN METEC PRIVATE LIMITED - Kolkata 13 PBE 05-4852.xlsx
CET-17(4)/4248/24-105 Upgradation of electrical & automation system of LHF-2A in CCM-II ROURKELA STEEL PLANT 20 Feb 2026 23.9300 13.7900 Danieli India Ltd. 13 PBE-05-4248.xlsx
CET-17(4)/5071/2025-13 Replacement of Benzol Storage unit at CO&BPP at BSL BOKARO STEEL PLANT 20 Feb 2026 29.3900 29.5200 GORANTLA GEOSYNTHETICS PVT LTD 13 PBE-02-5071.xlsx
CET-17(4)/5035/157 "APPOINTMENT OF ENGINEERING AND CONSTRUCTION MANAGEMENT CONSULTANTS FOR THE DIFFERENT PACKAGES IN THE DPR FOR 4.08 MTPA CRUDE STEEL EXPANSION OF SAIL/ISP" IISCO STEEL PLANT 20 Feb 2026 595.9300 594.2600 MN DASTUR CO 0 5035_PBE - 12.08.2024.xlsx
CET-17(4)/4784/189 Secondary emission control system for converters of SMS-II, (Main Package - Package 1) BOKARO STEEL PLANT 20 Feb 2026 152.4700 162.7800 Primetals Technologies India Private Limited 13 4784 PBE.xls
CET-17(4)/5058/07 POWER SUPPLY UPGRADATION OF MERCHANT MILL DURGAPUR STEEL PLANT 23 Jan 2026 24.1400 14.0100 Consortium of Daga Power Systems & Engineers Pvt. Ltd. & R.P. Engineering Works 13 5058 PBER 23.01.2026.xlsx
CET-17(4)/4095/2026-002 Installation of Coke Oven Battery # 7 at RSP ROURKELA STEEL PLANT 09 Jan 2026 766.3000 783.6400 L&T and Consortium 13 PBE 05-4095 PKG 3.xls
CET-17(4)/5047/2025-127 INSTALLATION OF SLAB HANDLING CRANES AT QR BAYS OF SMS-II ROURKELA STEEL PLANT 22 Dec 2025 22.3600 23.4400 Anupam Industries Limited 13 PBE-05-5047.xls
CET-17(4)/5110/126 Brownfield Expansion of Durgapur Steel Plant DURGAPUR STEEL PLANT 22 Dec 2025 66.6400 45.9800 H N CONSTRUCTION PRIVATE LIMITED 13 5110 PBER (Package 9A) 12.12.2025.xlsx
CET-17(4)/5023-121 Installation of Universal Rail & Structural Mill BHILAI STEEL PLANT 06 Dec 2025 253.3400 204.4800 SCC Infrastructure Pvt. Ltd 13 m_5023-BSP-PBE.xlsx
CET-17(4)/5110/106 Brownfield Expansion of Durgapur Steel Plant Durgapur Steel Plant 07 Nov 2025 55.4800 43.3300 Sterling and Wilson Private Limited 13 5110 PBER (Package 5) 07.11.2025.xlsx
CET-17(4)/3377-94 INSTALLATION OF SINTER PLANT-II BOKARO STEEL PLANT 12 Oct 2025 643.7700 860.4800 L&T 13 3377-BSL-PBE.xlsx
CET-17(4)/5110-93 Brownfield Expansion of Durgapur Steel Plant Durgapur Steel Plant 09 Oct 2025 115.2000 64.7700 Eastern Metec Private Limited 13 5110 PBER (Package 7) 10.10.2025.xlsx
CET-17(4)/5110/88 BROWNFIELD EXPANSION OF DURGAPUR STEEL PLANT DURGAPUR STEEL PLANT 04 Oct 2025 34.6300 14.1700 Mechtrotech Projects Private Limited 13 5110 PBER (Package 6) 04.10.2025.xlsx
CET-17(4)/5110/87 BROWNFIELD EXPANSION OF DURGAPUR STEEL PLANT DURGAPUR STEEL PLANT 30 Sep 2025 584.8800 313.6000 Danieli & Consortium 13 5110 PBER (Package 4) 30.09.2025.xlsx
CET-17(4)/4350/2025-84 Replacement of 3 Nos. ETP in 1.6 MT Coal Chemicals Plant of DSP (RPN-Retender) DURGAPUR STEEL PLANT 24 Sep 2025 11.0800 12.1900 IMECO OVERSEAS PVT LTD 10 PBE 04-4350.xlsx
CET-17(4)/4526/77 Revamping of Level-1 and Level-2 at Reheating furnaces 2, 3 and 4 of HSM BOKARO STEEL PLANT 12 Sep 2025 9.6100 8.5700 DANIELI INDIA LIMITED 13 4526_PBER 2025.09.12.xls
CET-17(4)/4370 Installation of new Coke oven Gas Flare Stack at DSP Augmentation of facilities to supply rails for Iran export order DURGAPUR STEEL PLANT 11 Sep 2025 12.6000 8.9500 EASTZ ENERGY CONCEPTS 13 m_4730_PBE.xlsx
CET-17(4)/3388/69 Installation of 140TPH Walking Beam type Reheating Furnace in Plate Mill BHILAI STEEL PLANT 28 Aug 2025 163.6400 199.7000 Atmastco Ltd, Bhilai (Licensee) with Combustech Ltd, Korea (Licensor) 13 3388 PBE (Revised).xlsx
CET-17(4)/4820-22 PROCUREMENT OF ADDITIONAL TORPEDO LADLE CARS FOR BLAST FURNACES OF BSP BHILAI STEEL PLANT 10 Feb 2025 19.0500 9.4000 Larsen & Toubro Ltd. 13 4820_PBE.xlsx
CET-17(4)/4999-19 Replacement of one EOT crane of capacity (250+75/10)T in converter charging bay of SMS-2 ROURKELA STEEL PLANT 06 Feb 2025 55.8400 65.9500 Anupam Industries 13 s_4999-RSP-PBE.xlsx
CET-17(4)/4916-17 Replacement of secondary Gyratory Crusher into Cone Crusher at Ore Handling Plant of Barsua Iron Mines ROURKELA STEEL PLANT 04 Feb 2025 16.8500 16.7700 Larsen & Toubro Limited 13 m_4916-PBE.xlsx
CET-17(4)/3981/01 Super Accelerated Cooling System in Plate Mill BHILAI STEEL PLANT 06 Jan 2025 161.5700 147.0000 DANIELI INDIA LIMITED & Consortium of MACO CORPORATION INDIA (P) LIMITED 20 3981_PBER.xls
CET-17(4)/4624/2024-225 Replacement of 5 Nos. of EOT cranes at CRM, BSL BOKARO STEEL PLANT 05 Nov 2024 31.9100 46.8900 Mukand Ltd. 13 PBE-02-4624.xlsx
CET-17(4)/4413/2024-217 Augmenation of industrial water pumping and storage facilities at GOM Raw Materials Division 23 Oct 2024 7.7700 8.5800 SUPER INDIA FIRE SAFETY 13 PBE 02-4413.xlsx
CET-17(4)/4991/213 INSTALLATION OF TWO NOS. OF LADLE TILTERS AT SMS, ISP IISCO STEEL PLANT 15 Oct 2024 9.8500 10.8500 Graduate Agro & Mechanical Engineers 13 s_4991_PBE.xlsx
CET-17(4)/4941/190 Extension of mixer bay and replacement of 02 nos mixer cranes 125+30t, span 28 m in SMS-2, (Pkg-2) BHILAI STEEL PLANT 12 Sep 2024 49.2100 49.2000 PREET BROTHERS LIMITED 13 m_4941_PBE-Pkg-2.xlsx
CET-17(4)/5043/174 Revamping of WG#1 & HG#6 Manual Roll Grinding Machine to CNC Roll Grinding Machine ROURKELA STEEL PLANT 28 Aug 2024 22.8900 24.8000 MAXIS MOTION CONTROLS PVT. LTD.- Pune 13 s_5043_PBE.xlsx
CET-17(4)/4926-164 REPLACEMENT OF EXISTING GRINDER IN CRM-I & II OF SAIL/ Bokaro Steel Plant BOKARO STEEL PLANT 16 Aug 2024 129.0800 159.3000 Thermo Systems Pvt. Ltd. 13 4926 PBE.xlsx
CET-17(4)/4899/160 Installation of new Coke oven Gas Flare Stack at RSP ROURKELA STEEL PLANT 05 Aug 2024 11.2800 14.7200 Edifice Engineering Enterprise Pvt. Ltd. 13 4899 _PBE.xlsx
CET-17(4)/4941/134 Extension of mixer bay and replacement of 02 nos mixer cranes 125+30t, span 28 m in SMS-2 BHILAI STEEL PLANT 27 Jun 2024 66210555.1800 62767606.3100 Ajeet Enterprises, Bhilai 13 m_4941_PBE-Pkg-1.xlsx
CET-17(4)/4918/2024-126 Installation of New Stamp Charge Battery with other facilities at ISP IISCO STEEL PLANT 14 Jun 2024 1707.9100 2188.1800 Consortium of PWIT and others 13 PBE-03-4918 PKG 2.xlsx
CET-17(4)/4918/24-123 Proposal for New Stamp Charge Battery with other facilities at ISP IISCO STEEL PLANT 11 Jun 2024 822.4300 849.5900 HUTNI PROJECT FM (INDIA) PRIVATE LIMITED 13 PBE 03-4918-PKG4.xls
CET-17(4)/4918/2024-124 Installation of New Stamp Charge Battery with other facilities at ISP IISCO STEEL PLANT 10 Jun 2024 716.5200 382.7300 TATA PROJECTS LIMITED & Consortium 13 PBE 03-4918 PKG 3.xls
CET-17(4)/4753/112 Installation of 4th Stove in BF # 5 at RSP - 27 May 2024 - 90.9600 PRIMETALS TECHNOLOGIES INDIA PRIVATE LIMITED 0 4753_PBE 01.10.2024.xlsx
CET-17(4)/4964/101 Relining of Stoves of BF#3, DSP DURGAPUR STEEL PLANT 09 May 2024 94.8200 101.3100 Danieli Corus India Private Limited. 14 m_4964_PBE.xlsx
CET-17(4)/4876/2024-REF.NO.:CET-17(4)/4876/2023- UPGRADATION OF BLAST FURNANCE NO. 3 OF DSP DURGAPUR STEEL PLANT 23 Mar 2024 567.3300 414.0100 Consortium of Paul Wurth S.A., Luxembourg and SMS India Private Limited 13 c_4876-DSP-PBE.xlsx
CET-17(4)/4765/51 Installation of Flare Stack for COB-10 at ISP IISCO STEEL PLANT 14 Mar 2024 7.9900 8.8800 EDIFICE ENGINEERING ENTERPRISE PVT LTD-DURGAPUR 13 m_4765 PBE .xlsx
CET-17(4)/4825-41 Upgradation of ESP in Sinter Plant - 2 DSP, (MAIN PACKAGE) DURGAPUR STEEL PLANT 04 Feb 2024 68.7800 46.9500 EDIFICE ENGINEERING ENTERPRISE PVT LTD- & CONSORTIUM 13 PBE-04-4825.xlsx
CET-17(4)/4938/ DE-BOTTLENECKING IN AREAS OF SP1 : REVAMPING OF APC SYSTEMS Augmentation of facilities to supply rails for Iran export order DURGAPUR STEEL PLANT 13 Dec 2023 18.9600 19.8600 Edifice Engineering Enterprise Pvt Ltd-Consortium of Edifice Engineering Enterprise Pvt Ltd & Himenviro Environmental Engg. Co. Pvt Ltd 13 4938_Firmedup_variance - 29.08.2024.xlsx
CET-17(4)/4031-251 Installation of high pressure descaling system in plate mill (01/de/4031) BHILAI STEEL PLANT 16 Oct 2023 33.7000 31.3700 MACO CORPORATION (INDIA) PVT LTD. 13 4031_PBE.xlsx
CET-17(4)/4750-243 Procurement of Installation of FDA & CCTV system in all HT substations along with centralized monitoring at BSL BOKARO STEEL PLANT 07 Oct 2023 6.9500 4.0400 Glyptic India Revised Price Break Up dt.22.09.2023 (vide email from BSL dt.05.10.2023) 13 4750_PBE.xlsx
CET-17(4)/4848-241 Replacement of LT Switchboards of 06 Nos. Sub-stations in Coke Oven By Product Plant Complex (01/DE/4848) BOKARO STEEL PLANT 06 Oct 2023 6.4500 3.2200 HIND ELECTRIC WORKS - BOKARO 13 4848_PBE.xls
CET-17(4)/4698/240 Replacement of old transfer car at SMS-II, BSP BHILAI STEEL PLANT 05 Oct 2023 17.8800 17.7500 PROWESS INTERNATIONAL PRIVATE LIMITED 13 s_4698_PBE.xlsx
CET-17(4)/4095/2023-226 Installation of Coke Oven Battery # 7 at RSP ROURKELA STEEL PLANT 21 Sep 2023 1441.0600 1939.5500 Consortium of Larsen & Toubro Limited and Thyssenkrupp UHDE GmbH, Germany 13 PBE-05-4095-PKG2.xls
CET-17(4)/4880- Replacement of Balance 4 nos. battery cyclones by ESPs for SP I, BSL BOKARO STEEL PLANT 12 Sep 2023 204.9900 22.6500 BHEL 13 m_4880_PBE.xlsx
CET-17(4)/4099/2023-213 Rebuilding of Coke Oven Battery # 6 BOKARO STEEL PLANT 07 Sep 2023 396.7200 428.6000 MECON LIMITED 13 4099-PBE Pkg-1.xlsx
CET-17(4)/4906-206 Revamping of BF#3 BOKARO STEEL PLANT 29 Aug 2023 370.9900 383.2800 Consortium of Paul Wurth Italia S.p.a. (PWIT), Paul Wurth India Pvt. Ltd. (PWIN) & MCK Kutty Engineers (MCK) (Decremental Bid dated :27.07.2023) 13 c_4906-BSL-PBE.xlsx
CET-17(4)/3340-177 REVIVAL OF HEARTH LAYER IN SINTERING PLANT BOKARO STEEL PLANT 29 Jul 2023 19.1300 23.5800 H N Construction Pvt. Ltd. 13 3340-BSL-PBE.xlsx
CET-17(4)/4747/159 Rebuilding of COB#4 (Package-1, Battery Proper) DURGAPUR STEEL PLANT 14 Jul 2023 484.3700 620.7500 BEC & Consortium 13 c_4747_PBE Pkg-1.xlsx
CET-17(4)/4747/138 Rebuilding of COB#4 (Oven Machines: PKg-II) DURGAPUR STEEL PLANT 30 Jun 2023 74.6500 61.2200 BHILAI ENGG CORP LIMITED - INDIA 13 m_4747_PBE Pkg-2.xlsx
CET-17(4)/4095/130 Installation of Stamp Charge COB 7 ROURKELA STEEL PLANT 17 Jun 2023 746.6100 820.2400 Consortium of Hutni Projekt Frydek- Mistek a.s, Czech Republic and Hutni Projekt FM (India) Private Limited, Kolkata 13 4095-PBE PKG 4.xlsx
CET-17(4)/4702-126 Installation of Fourth Hot Blast Stove at BF#5 Complex ISP 12 Jun 2023 83.1700 74.9400 Primetals Technologies India Pvt. Ltd.(Negotiated) 13 m_4702-ISP-PBE.xlsx
CET-17(4)/4471-116 Replacement of converter vessel, trunion ring & support system of secondary emission control for three converters in SMS-II 481.78550577439 BHILAI STEEL PLANT 06 Jun 2023 317.5100 346.9900 MECON 0 4471 -PBE.xlsx
CET-17(4)/4549/76 Replacement of 3 TP -1 Sub station, BF, BSL BOKARO STEEL PLANT 21 Apr 2023 5.3900 4.6000 IEE PROJECTS PRIVATE LIMITED - kolkata 13 4549_PBE.xlsx
CET-17(4)/4878/54 Reconstruction of the unused Stove No. 4 in BF#2 BOKARO STEEL PLANT 01 Apr 2023 41.8600 49.1700 Paul Wurth India Pvt. Ltd. 13 m_4878_PBE.xlsx
CET-17(4)/4622-13 INSTALLATION OF POWER SUPPLY PACKAGE FOR 1000 TPD OXYGEN PLANT ROURKELA STEEL PLANT 31 Jan 2023 58.5500 53.0900 Bharat Bijlee 13 m_4622-RSP-PBE.xlsx
CET-17(4)/4581/2023-02 Installation of Nitrogen Injection system in oil filled power and rectifier transformer of DNW (02/de/4581) BOKARO STEEL PLANT 11 Jan 2023 6.5600 1.5400 TECTONICUS SERVICES INDIA PRIVATE LIMITED -MAHARASTRA 13 4581_PBE.xlsx
CET-17(4)/4704/2022-106 Installation of U seals in Coke Oven gas Network of Bhilai Steel Plant (01/de/4704) BHILAI STEEL PLANT 10 Jun 2022 24.4800 15.4700 PLANT-TECH INDUSTRIAL SERVICES LIMITED-INDIA 12 4704_PBE.xlsx
CET-17(4)/4489/2022-103 INSTALLATION OF NEW COKE OVEN GASHOLDER Augmentation of facilities to supply rails for Iran export order DURGAPUR STEEL PLANT 07 Jun 2022 65.6100 79.1300 GACL-MICCO 13 4489 PBE .xlsx
CET-17(4)/4569/2022-68 Replacement & Up-gradation of existing Air Relief Valve with Actuator and Mechanical type Governing System for Turbo-Blower No.5 at Old Power Plant (04/de/4569) DURGAPUR STEEL PLANT 24 Mar 2022 12.7000 16.7000 SIEMENS LIMITED 14 4569-PBE.xlsx
CET-17(4)/4614-47 Reconditioning & Up-gradation of SKODA Horizontal Boring Machine at Mechanical Shop ROURKELA STEEL PLANT 25 Feb 2022 4.7700 3.3600 Sharpline Automation (P) Ltd. 13 4614-RSP-PBE.xlsx
CET-17(4)/4638-43 Installation of Barrel Reclaimer for bed No.1 & 3 of OHP at RMHP IISCO STEEL PLANT 23 Feb 2022 24.6900 24.3500 Elecon Engg. Co. Ltd. 11 s_4638-ISP-PBE.xlsx
CET-17(4)/4308/2021-174 Stack Emission control for Laddle Furnaces 1 & 2 of SMS, DSP (01/de/4308) DURGAPUR STEEL PLANT 28 Oct 2021 3.2700 3.1300 SOIL AND ENVIRO INDUSTRIES PRIVATE LIMITED - Kolkata 13 4308_PBE.xlsx
CET-17(4)/4307/2021-175 Stack Emission control for Lime Kilns of NLCP, DSP DURGAPUR STEEL PLANT 28 Oct 2021 5.1300 4.0900 EASTERN METEC - Kolkata 13 4307-PBE.xlsx
CET-17(4)/4739/2021-142 Installation of Liquid Oxygen Storage Vessel with ambient vaporizer and distribution facility at Bokaro General Hospital BOKARO STEEL PLANT 13 Sep 2021 1.6700 1.2400 Inox Air products 13 4739_PBE.xlsx
CET-17(4)/4179/2021- Installation of a 4th slab caster at SMS-II, RSP ROURKELA STEEL PLANT 27 Jun 2021 757.5600 792.5800 SMS INDIA PVT. LTD. 11 4179-PBE .xlsx
CET-17(4)/4439/2021-55 Restoration of structures of SGP BF#4,DSP (04/de/4439) DURGAPUR STEEL PLANT 10 Mar 2021 299.6400 272.6700 EASTERN METEC PRIVATE LIMITED - Kolkata 136 4439 PBE.xlsx
CET-17(4)/3541/123DTD.07.09.2019 REBUILDING OF COKE OVEN BATTERY # 7 & 8 BHILAI STEEL PLANT 07 Sep 2019 299.9800 298.9800 MECON LIMITED 10 3541-PBE Pkg-1.xlsx
CET-17(4)/4024/2018-65 Replacement of converter with bottom stirring system and Secondary Emission Control for three nos. converters in SMS-II DURGAPUR STEEL PLANT 13 Jun 2018 211.4800 217.1300 SMS Group GmbH, Germany and SMS India Pvt. Ltd. 14 4024-PBE MainPkg.xlsx
CET-17(4)/3743/217DTD.14.09.2015 Price Bid Evaluation for the Package : Rebuilding of Coke Oven Battery No.-8 (Battery Proper-Package No. 1) BOKARO STEEL PLANT 14 Sep 2015 148.7800 118.6000 MECON Ltd. 13 3743-PBE Pkg-1.xlsx
N/A Rebuilding of Coke Oven Battery No.-7 (Battery Proper-Package No. 1) BOKARO STEEL PLANT 13 Aug 2013 117.3500 122.6800 MECON Ltd. 13 3480-PBE Pkg-1.xlsx